"Strengthening the Environmental Inspection Capacity of the Marmara Sea Basin Project" Started
In order to solve the mucilage problem and to control pollution in the Sea of Marmara, an effective and basin-specific environmental control system should be established and implemented in accordance with the recently stated action plan. In this respect, “Strengthening the Environmental Inspection Capacity of the Marmara Sea Basin Project” was launched in October 2021 by the Ministry of Environment, Urbanization and Climate Change of TR in order to increase the effectiveness of environmental inspection practices carried out and to determine the measures to be taken in order to ensure unity in practice in the "Marmara Sea Hydrological Basin", which constitutes the sub-basins of the Marmara and the Susurluk River Basins that discharge into the Marmara Sea.